![]() ![]() Depending on the type of service provided, contractors must present a valid state license, provide an original bond (no emails or faxes will be accepted), a Certificate of Insurance with the Village of Schiller Park, 4501 N 25th Ave, Schiller Park, IL 60176 as the certificate holder, as well as pay a fee. How does a contractor become registered with the Village?įor contractors: to become registered with the Village, complete our Contractor License Application Form. Additionally, all contractors and subcontractors performing work on any property in Schiller Park must be licensed and registered with the Village.įor more information on building permit requirements and obtaining a contractors license, please visit our Building Permit Application Process Page here. In the application, please provide detailed construction information, including drawings and/or a plat of survey. Building permit applications are available online or at the Community Development Department office located at 4501 N 25th Ave or online. To receive a permit, it is required for the applicant to submit a completed building permit application to the Community Development Department. For more information, please visit our Building Permit Inspections Page. Additionally, please schedule all pertinent inspections by calling Community Development at 84. ![]() Please have these permit cards posted in an area that is visible for public viewing. After all permit fees are paid, either a green (for homeowners) or yellow (for contractors) permit card will be issued to post on your front door or window. ![]() Applicants may pay with cash, check, and/or credit card. The Community Development Department office is open Monday through Friday from 9 a.m. Once your plans have been approved, the applicant will be notified for permit pickup and payment. You may call or email the Building and Safety Division to inquire about the status of the permit, but please be aware that plan review time may be affected by the department’s workload and/or unforeseen projects. The applicant will be contacted if the plan reviewer has any questions or problems, or if any additional information is needed. How do I check on the status of a building permit application?Īfter the building permit application has been submitted, it generally takes 7 to 10 business days to process for residential properties. For more information on this program, please visit our Sewage Backflow Prevention Program Page here. This program provides a resident a grant of 50% of the cost up to a maximum of $1,500. The Village has a grant program for single-family, two-flat, and three-flat owner-occupied homes to install a check valve device. Does the Village have a grant program for installing flood prevention devices? Again, please note this list is not a recommendation on behalf of the Village of Schiller Park. If the applicant is interested in viewing this contractor list, it is available upon request during business hours: Monday through Friday from 9 a.m. However, the Building and Safety Division does have a list of contractors that are registered and insured with the Village. Does the Building and Safety Division recommend contractors?ĭue to potential liability issues, the Village cannot make any recommendations. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |